dreamsproject.dk

📜 Historical scan 2026-10-08 04:00:27  ·  ← Latest scan
⬇ Zone File 📜 Timeline & History ⚡ Scan Now

dreamsproject.dk is a .dk domain served by 2 nameservers (ns1.aau.dk, ns2.aau.dk). It was registered on 9 September 2020 (WHOIS) and was already in the .dk zone when our tracking began on 16 June 2026. Its website address 130.225.57.86 is hosted by IDDQD-AS (AS1835) in Denmark. Mail is handled by dreamsproject-dk.mail.protection.outlook.com. The zone is not DNSSEC-signed, has no DMARC policy and has no IPv6 address. Below are all of its DNS records from this scan: nameservers, A/AAAA, MX, TXT, SPF, DMARC, CAA, TLSA/DANE, MTA-STS, SRV and more.

🖥️ Nameservers#

2 records   44ms

🌍 A Records#

1 records   35ms
IPTTLPTRASNISP / OrgCIDRCountryCity
130.225.57.86 3600s wp-vhost03.srv.aau.dk AS1835 IDDQD-AS 130.225.0.0/16 🇩🇰 Denmark —

📧 MX Records#

1 records   41ms
PriorityTTLMail ServerIP addressesPTRASN
40 3600s dreamsproject-dk.mail.protection.outlook.com — — —

🔷 AAAA Records (IPv6)#

✗ No AAAA records — IPv6 not configured

🔐 HTTPS Records#

✗ No HTTPS RR — no SVCB/HTTPS service binding

📝 TXT Records#

1 records   235ms
TXT Record
v=spf1 include:_spfhard.aau.dk -all

✉️ SPF#

PolicyRecord (dreamsproject.dk)
-all (hard fail) v=spf1 include:_spfhard.aau.dk -all

📨 DMARC#

✗ No DMARC record — mail spoofing not restricted

📬 MTA-STS#

✗ No MTA-STS policy — SMTP TLS not enforced

📈 TLSRPT#

✗ No TLSRPT record — no SMTP TLS failure reporting

📜 CAA Records#

✗ No CAA records — any CA may issue certificates

🧩 Web & zone#

latest probe, not this scan · checked 2026-10-23 05:00:33
www130.225.57.86 (AS1835) (address records, no CNAME)
www vs bare domainSame network
dreamsproject.dk: 130.225.57.86 (AS1835)
www.dreamsproject.dk: 130.225.57.86 (AS1835)
WildcardNo

🔎 SPF check#

zone-wide SPF report

DNS lookups: 2/10 · policy: -all

No problems found

🔏 ACME Challenge#

TypeNameValue
CNAME _acme-challenge.dreamsproject.dk 38b14d2a-d3ed-4c44-be97-a83063704c08.acme.aau.dk
TXT 38b14d2a-d3ed-4c44-be97-a83063704c08.acme.aau.dk GBqiQ_-pnswPpBYXYGdnByoWln0-5LYfJNWo6mh9yRw
TXT 38b14d2a-d3ed-4c44-be97-a83063704c08.acme.aau.dk oiA7v6o0JLdA9DQXTdEfP4sSd5hWmD1EvHD-GDojsOs

🔗 TLSA / DANE#

✗ No TLSA records — DANE not configured for HTTPS (_443) or MX (_25)

🔐 DNSSEC#

85ms
CheckResult
Validation Status🔓 Insecure
AD Flag (resolver validates)✗ Not set
DS Record✗ Not found
DNSKEY Record✗ Not found
Flagsunsigned answer

🏷️ SOA#

58ms
FieldValue
Serial2023082402
Primary NS (MNAME)ns1.aau.dk
Responsible (RNAME)hostmaster@its.aau.dk
Refresh3600s
Retry900s
Expire1209600s
Minimum (neg-cache TTL)86400s

📋 Registration#

WHOIS fetched 2026-10-09 04:34:26
FieldValue
RegistrarPunktum dk A/S (direct)
Registered2020-09-09
Expires2027-09-30 (342d)
📋 WHOIS#

⏱️ Lookup Timing#

NS
44ms
A
35ms
MX
41ms
AAAA
36ms
TXT
235ms
CAA
45ms
HTTPS
44ms
TLSA
678ms
SOA
58ms
MTA-STS
62ms
DNSSEC
85ms
SRV
66ms
Total
1211ms

🕐 Scan History#

Scanned AtDurationRecordsDNSSEC
2026-10-23 05:00:33 6728ms 2 NS 1 A 1 MX 🔓 Insecure
2026-10-08 11:17:06 1047ms 2 NS 1 A 1 MX 🔓 Insecure
2026-10-08 04:00:27 shown 1211ms 2 NS 1 A 1 MX 🔓 Insecure
2026-08-27 13:26:19 1349ms 2 NS 1 A 1 MX 🔓 Insecure
2026-07-25 01:26:51 60124ms 2 NS 1 A 0 MX 🔓 Insecure
2026-06-26 00:53:31 1525ms 2 NS 1 A 1 MX 🔓 Insecure
2026-06-17 04:50:27 1298ms 2 NS 1 A 1 MX 🔓 Insecure
2026-06-17 04:30:41 7291ms 2 NS 1 A 1 MX 🔓 Insecure
dhd.dk [/] search Domains, Hosts & DNS — .dk zone